AREX

AREX

Overview
StatusOperational
OwnerKorea Rail Network Authority
Termini
Stations14
Service
TypeCommuter Rail
SystemSeoul Metropolitan Subway
Operator(s)Airport Railroad Co., Ltd.
Depot(s)Yongyu
Daily ridership182,343
History
OpenedPhase 1: March 23, 2007 (2007-03-23)
Phase 2: December 29, 2010 (2010-12-29)
Phase 3: September 2018 (2018-09)
Technical
Line length63.8 km (39.6 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV 60 Hz AC from overhead catenary
Operating speed110 km/h (68 mph)
Route map

0.0
A01 Seoul
3.3
A02 Gongdeok
6.1
A03 Hongik Univ.
9.5
A04 Digital Media City
(Susaek connecting Line)
18.1
A042 Magongnaru
20.4
A05 Gimpo Int'l Airport
27.0
A06 Gyeyang
32.5
A07 Geomam
37.3
A071 Cheongna Int'l City
47.6
A072 Yeongjong
51.1
A08 Unseo
55.4
A09 Incheon Int'l Airport Cargo Terminal
58.0
A10 Incheon Int'l Airport Terminal 1
63.8
A11 Incheon Int'l Airport Terminal 2
Yongyu Triple Line
Yongyu Rail Yard (Yongyu)
AREX
Hangul
인천국제공항철도, AREX (에이렉스)
Hanja
仁川國際空港鐵道, AREX (에이렉스)
Revised RomanizationIncheon Gukje Gonghang Cheoldo, Eirekseu
McCune–ReischauerInch'ŏn Kukche Konghang Ch'ŏlto, Eireksŭ

AREX (Airport Railroad Express; Korean: 인천국제공항철도) is an airport rail link and commuter rail line in the Seoul Metropolitan Area of South Korea, linking Incheon International Airport and Gimpo International Airport with Seoul Station. The section between the two airports opened on March 23, 2007, and the line was extended to Seoul Station on December 29, 2010.

Long-distance Korea Train Express high speed trains started to use the line from June 30, 2014, but discontinued the service in March 2018 due to low ridership.