Batinah Expressway

Batinah Expressway
Batinah Expressway under construction in 2016
Route information
Length256 km (159 mi)
Existed2018–present
Location
CountryOman
Highway system

The Batinah Expressway is a 256 km 8-lane highway in Oman that connects the Muscat Expressway (a relief road in Muscat, the capital of Oman) at Halban with the United Arab Emirates border at Khatmat Malaha. It opened on 6 May 2018.