Bellflower station

Bellflower
Historic Pacific Electric depot building
General information
Location16336 Bellflower Boulevard
Bellflower, California
Coordinates33°53′08″N 118°07′30″W / 33.885662°N 118.125117°W / 33.885662; -118.125117
Other information
StatusPlanned
History
OpenedNovember 6, 1905 (Pacific Electric)
ClosedMay 24, 1958 (Pacific Electric)
Rebuilt1927
2035 (estimated)
Future services
Preceding station Metro Rail Following station
Paramount/Rosecrans
toward Slauson
Southeast Gateway Line
Phase 1
Pioneer
Terminus
Former services
Preceding station Pacific Electric Following station
Rendalia Santa Ana Woodruff Avenue
before 1950
toward Santa Ana SP Depot
Location

Bellflower station is a planned light rail station in the Los Angeles Metro Rail system. It is part of the Southeast Gateway Line project. The segment of the corridor is expected to begin operations in 2035.