Beverly Drive station
| Beverly Drive station under construction in August 2023 | |||||||||||
| General information | |||||||||||
| Location | Wilshire Boulevard Beverly Hills, California | ||||||||||
| Coordinates | 34°4′01″N 118°23′54″W / 34.06694°N 118.39833°W | ||||||||||
| Owned by | Los Angeles County Metropolitan Transportation Authority | ||||||||||
| Platforms | 1 island platform | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Accessible | Yes | ||||||||||
| Other information | |||||||||||
| Status | Under construction | ||||||||||
| History | |||||||||||
| Opening | 2026 | ||||||||||
| Previous names | Wilshire/Rodeo | ||||||||||
| Future services | |||||||||||
| 
 | |||||||||||
| 
 | |||||||||||
Beverly Drive station is an under construction, underground rapid transit (known locally as a subway) station on the D Line of the Los Angeles Metro Rail system. It is currently under construction as part of the D Line Extension project, in Beverly Hills, California. Construction started in 2018 as part of Section 2 of the extension project. It is slated to open in 2026.
The station is being built at the site of the former Ace Gallery on the southwest corner of Wilshire Boulevard and Reeves Drive in Beverly Hills.