Bukit Payung–Telemung Highway
| Bukit Payong-Telemung Highway | |
|---|---|
| Route information | |
| Length | 15.5 km (9.6 mi) |
| Major junctions | |
| West end | Kuala Jeneris |
| FT 36 Second East-West Highway FT 247 East Coast Expressway FT 14 Jerangau-Jabor Highway | |
| East end | Bukit Payung |
| Location | |
| Country | Malaysia |
| Highway system | |
Bukit Payung–Telemung Highway is a major controlled-access highway in Terengganu, Malaysia. This highway is part of the Package 11 and 12 of the East Coast Expressway Phase 2 project (Jabur - Kuala Terengganu). This highway was opened to all traffic on 18 May 2012.
At most sections, the highway was built under the JKR R5 road standard, allowing maximum speed limit of up to 90 km/h.