CRRC Qingdao Sifang CR151

CRRC Qingdao Sifang CR151
Exterior mockup of the CR151
Interior mockup of the CR151.
Stock typeElectric multiple unit
In service2030 (2030) (Projected)
ManufacturerCRRC Qingdao Sifang
Built atQingdao, Shandong, China
Constructed2025 – 2030
Entered service2030 (2030) (Projected)
Number under construction264 Vehicles (44 Sets)
Number built264 Vehicles (44 Sets)
Formation6/8 per trainset
DT–Mp–Mi+Mi–Mp–DT
Capacity1920 passengers per 6-car train
DepotsChangi East
Lines served CRL  Cross Island Line
Specifications
Car body constructionWelded aluminium
Train length138.5 m (454 ft 4+34 in)
Car length
  • 23.65 m (77 ft 7+18 in) (DT)
  • 22.8 m (74 ft 9+58 in) (Mp/Mi)
Width3.2 m (10 ft 6 in)
Height3.7 m (12 ft 1+58 in)
Doors1,450 mm (57+18 in), 10 per car, 5 per side
Maximum speed
  • 100 km/h (62 mph) (design)
  • 90 km/h (56 mph) (service)
Electric system(s)1,500 V DC Overhead conductor rail
Current collector(s)Pantograph
Safety system(s)Siemens Trainguard Sirius moving block CBTC ATC under ATO GoA 4 (UTO)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The CRRC Qingdao Sifang CR151 is a type of electric multiple unit to be built for the Cross Island Line of Singapore's Mass Rapid Transit (MRT) system. The contract was awarded to CRRC Sifang, a consortium of CRRC Qingdao Sifang Company and Singapore CRRC Sifang Railway Vehicles Service, and as of June 2023 the Land Transport Authority (LTA) has purchased 44 six-car trains. They will be delivered from 2027, before the opening of the line's first phase in 2030.