Caravaggio (train)

ETR 421/521/621 Rock
A Trenitalia ETR 521 "Rock" train at Fara Sabina-Montelibretti railway station
ManufacturerHitachi Rail Italy
Constructed2017–
Entered service14 June 2019
FormationETR 421 - 4 cars
ETR 521 - 5 cars
ETR 621 - 6 cars
CapacityETR 421 - 479
ETR 521 - 629
ETR 621 - 729
OperatorsTrenitalia
Trenord
Specifications
Train lengthETR 421 - 109.6 m (359 ft 7 in)
ETR 521 -136.8 m (448 ft 10 in)
ETR 621 - 163.4 m (536 ft 1 in)
Width2.8 metres (9 ft 2 in)
Height4.3 metres (14 ft 1 in)
Maximum speed160 km/h (99 mph)
Acceleration1.1 m/s2 (2.5 mph/s)
Notes/references
"Scheda treno Rock Trenitalia" (PDF). Train data sheet. Trenitalia. Retrieved 2022-09-20.

The Caravaggio (Rock for Trenitalia) is an electric multiple unit (EMU) developed and built by Hitachi Rail Italy. It is named after the Italian Baroque painter Michelangelo Merisi da Caravaggio.

The Caravaggio was ordered by Italian operator Trenitalia in June 2016; follow-on orders were placed by Trenitalia and Ferrovie Nord Milano. The first trainset rolled-out in April 2018. The Caravaggio entered revenue service with Trenitalia on 14 June 2019; it has been branded as "Rock".