Charlestown Elevated

Charlestown Elevated
An Orange Line train on the Charlestown Bridge in 1967
Overview
Termini
Stations5
Service
SystemBERy Main Line / MBTA Orange Line
History
OpenedJune 10, 1901
ClosedApril 4, 1975
Technical
Number of tracks2
Track gauge4 ft 8+12 in (1,435 mm)
Route map
Everett
Sullivan Square
Thompson Square
City Square
North Station
Tremont Street subway
(1901–1908)
Washington Street subway
(1908–1975)

The Charlestown Elevated was a segment of the MBTA Orange Line rapid transit line that ran from the Canal Street Incline in downtown Boston, Massachusetts through Charlestown to a terminal in Everett, Massachusetts. It opened in June 1901 and was replaced by the Haymarket North Extension in April 1975.