Line 2 (Chengdu Tram)
| Chengdu Tram Line 2 | |
|---|---|
| Overview | |
| Native name | 成都有轨电车蓉2号线 |
| Locale | Chengdu, China |
| Stations | 35 |
| Service | |
| Type | Tram |
| Services | 1 (main & branch) |
| Rolling stock | Alstom Citadis 302 |
| History | |
| Opened | 26 December 2018 |
| Technical | |
| Line length | 39.3 km (24.4 mi) |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
| Electrification | 750 V DC Overhead line |
Chengdu Tram Line 2 is a tram line in Chengdu, China. The line has a total length of 39.3 kilometres (24.4 mi) and 35 stations (and will have 47 in the long term). It has a 'Y' layout and runs from the Chengdu West railway station to Pixian West railway station and Hongguang. The line was officially started in December 2015, and the 13.7 km (8.5 mi) demonstration section of the line was opened on 26 December 2018, and the remaining sections were opened on 27 December 2019.