Chunshen Road station
Station platform, Xinzhuang-bound side | |||||||||||||||
| Chinese name | |||||||||||||||
| Chinese | 春申路 | ||||||||||||||
| |||||||||||||||
| General information | |||||||||||||||
| Location | Humin Highway and Chunshen Road Minhang District, Shanghai China | ||||||||||||||
| Coordinates | 31°06′00″N 121°22′52″E / 31.1°N 121.381°E | ||||||||||||||
| Operated by | Shanghai No. 1 Metro Operation Co., Ltd. | ||||||||||||||
| Line(s) | Line 5 | ||||||||||||||
| Platforms | 2 (2 side platforms) | ||||||||||||||
| Tracks | 2 | ||||||||||||||
| Construction | |||||||||||||||
| Structure type | Elevated | ||||||||||||||
| Accessible | Yes | ||||||||||||||
| History | |||||||||||||||
| Opened | 25 November 2003 | ||||||||||||||
| Services | |||||||||||||||
| |||||||||||||||
| |||||||||||||||
Chunshen Road (Chinese: 春申路; pinyin: Chūnshēn Lù) is an above-ground station on Line 5 of the Shanghai Metro. Located at the intersection of Humin Highway and Chunshen Road in the city's Minhang District, the station opened with the rest of the first phase of Line 5 on 25 November 2003. It is currently served by six-car trains running on the mainline of Line 5 between Xinzhuang and Fengxian Xincheng stations. Between 28 December 2018 and 26 December 2020, passengers who wish to travel to stations on the branch line of Line 5 between Dongchuan Road and Minhang Development Zone stations must transfer to four-car trains at Dongchuan Road station. Since 26 December 2020, both the main and the branch line trains run all the way to Xinzhuang with no shuttle service.