Corrib gas project
| Corrib gas field | |
|---|---|
Location of the Corrib gas field | |
| Country | Ireland |
| Region | Slyne Trough basin |
| Location | west of the Mullet Peninsula, County Mayo |
| Block | 18/20; 18/25 |
| Offshore/onshore | offshore |
| Operator | Vermilion Energy |
| Partners | Vermilion Energy (56.5%) Canada Pension Plan Investment Board (43.5%) |
| Field history | |
| Discovery | 1996 |
| Start of development | 2004 |
| Start of production | 2015 |
| Production | |
| Estimated gas in place | 1,000×109 cu ft (28×109 m3) |
| Recoverable gas | 594×109 cu ft (16.8×109 m3) |
| Producing formations | Triassic Sandstones |
The Corrib gas project (Irish: Tionscanamh Ghás Aiceanta na Coiribe) is a developed natural gas deposit located in the Atlantic Ocean, approximately 83 kilometres (52 mi) off the northwest coast of County Mayo, Ireland. The project includes a natural gas pipeline and an onshore gas processing plant, which commenced gas production in 2015. During its development, the project attracted considerable opposition.
The Corrib field is Ireland's only domestic source of natural gas production.