Dahong Men station
Platform | ||||||||||||||||
| General information | ||||||||||||||||
| Location | Nanyuan Road and Linhong Road (临泓路) Fengtai District, Beijing China | |||||||||||||||
| Coordinates | 39°50′43″N 116°23′57″E / 39.845383°N 116.399154°E | |||||||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
| Line(s) | Line 10 Line 8 (Not Opened) | |||||||||||||||
| Platforms | 4 (1 island platform, 1 island platform unopened) | |||||||||||||||
| Tracks | 4 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Underground | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | 30 December 2012 (Line 10) 2025 (Line 8) | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Dahong Men station (simplified Chinese: 大红门站; traditional Chinese: 大紅門站; pinyin: Dàhóng Mén zhàn) is a station on Line 10 of the Beijing Subway.
The Line 10 station opened on December 30, 2012.
Currently, Line 8 trains pass through the station without stopping here. Due to demolition and construction of the transfer channel, the station for Line 8 is expected to open in 2025.