Dasmariñas–Las Piñas Transmission Line
| Dasmariñas – Las Piñas Transmission Line | |
|---|---|
| Location | |
| Country | Philippines |
| Province | Cavite Metro Manila |
| Coordinates | 14°18′41″N 120°57′9″E / 14.31139°N 120.95250°E 14°28′38″N 120°58′25″E / 14.47722°N 120.97361°E |
| From | Dasmariñas Substation |
| To | Las Piñas Substation |
| Ownership information | |
| Owner | see Technical description |
| Operator | see Technical description |
| Construction information | |
| Construction started | May 27, 1998 |
| Commissioned | July 15, 1999 |
| Technical information | |
| Type | Overhead transmission line |
| Type of current | HVAC |
| Total length | 21 km (13 mi) |
| No. of transmission towers | 210 (209 steel poles and 1 lattice tower) |
| AC voltage | 230 kV |
| No. of poles | 209 |
| No. of circuits | 2 |
The Dasmariñas – Las Piñas Transmission Line (abbreviated as 8LI1DAS-LPI, 8LI2DAS-LPI and DLPTL) is a 230,000 volt, double-circuit transmission line in Metro Manila and Calabarzon, Philippines that connects Dasmariñas and Las Piñas substations of National Grid Corporation of the Philippines (NGCP).