Diakopto–Kalavryta railway

Diakopto–Kalavryta railway
Overview
StatusOperational
OwnerGAIAOSE
LocaleCentral Greece
Termini
Stations6 (3 disused)
Service
TypeAbt system
Operator(s)Hellenic Train
History
Opened10 March 1896
Technical
Line length22.346 km (13.885 mi)
Number of trackssingle track
Track gauge750 mm (2 ft 5+12 in)
Electrificationdiesel-electric
Operating speed80 km/h (50 mph) (average)
Route map

km
-0.10
-0.03
0.00
Diakopto
(Διακοπτό)
10 m
0.13
0.58
Kernitsis
0.74
Palea EO Korinthou Patron
0.91
E65 /
A 8
 
 
1.57
5.00
5.11
Niamata
(Νιάματα)
122 m
5.60
Vouraikos Bridge 1 (36 m, Start of gorge)
5.67
Start of rack
5.92
Tunnel 1 (44 m)
5.98
Rock shelter + Tunnel 2 (153 m)
6.21
Tunnel 3 (58 m)
6.30
Bridge 2 (21 m)
6.39
Tunnel 4 (24 m) + 5 (21 m)
6.75
Rock shed 6 (77 m)
6.94
Tunnel 7 (25 m) + 8 (23 m)
7.31
Bridge 3 (58 m)
7.60
Tunnel 9 (12 m)
8.05
Tunnel 10 (15 m)
8.08
End of rack
8.14
Triklia
426 m
8.20
Bridge 4 (20 m)
8.24
Bridge 5 (21 m)
8.69
Rock shelter 11 (21 m)
9.04
Tunnel 12 (17 m)
9.29
Bridge 6 (17 m)
9.40
Triklia
(Τρικλιά)
466 m
9.46
Start of rack
9.69
480 m
10.15
End of rack
10.62
Tunnel 13 (59 m)
10.62
Bridge 7 (13 m) 10.68 Bridge 7 (10 m)
10.63
Tunnel 14 (112 m)
10.69
Tunnel 14 (46 m)
10.85
Portes
(Πόρτες)
531 m
10.92
Start of rack
10.94
Bridge 8 (13 m, End of gorge)
11.32
End of rack
12.60
Zachlorou / Mega Spileo
600 m
(Ζαχλωρού / Μέγα Σπήλαιο)
12.67
Bridge 9 (24 m)
14.90
Km 15
643 m
14.97
Eparchiaki Odos
16.80
Bridge 10 (28 m)
18.23
Kerpini
(Κερπινή)
681 m
18.45
21.84
22.16
Efseviou Kipourgou
22.33
Kalavryta
(Καλάβρυτα)
714 m
22.40
Engine shed
km

The Diakopto–Kalavryta railway (Greek: Οδοντωτός σιδηρόδρομος Διακοπτού - Καλαβρύτων, romanized: Odontotós sidiródromos Diakoptoú - Kalavrýton) is a historic 750 mm (2 ft 5+12-in) gauge rack railway in Greece. Located on the northern Peloponnese, it runs 22 kilometres (14 mi) from Diakopto through the Vouraikos Gorge and the old Mega Spilaion Monastery and up to Kalavryta, stopping en route at Zachlorou. Today, the stations infrastructure and rolling stock are owned and maintained by the GAIAOSE and the line infrastructure Hellenic Railways Organisation (OSE) and passenger trains are operated by Hellenic Train. At the Diakopto terminus, the line connects with the new standard-gauge Athens Airport–Patras railway where the new main line tunnels under the station yard. It now takes 2 hours 10 minutes to reach Athens.