Diebsteich station
Diebsteich railway station (after renovations) | ||||||||||||||||
| General information | ||||||||||||||||
| Location | Plönerstr. 22766 Hamburg Germany | |||||||||||||||
| Line(s) | RE70 IC/ICE | |||||||||||||||
| Platforms | 2 (island platform) + 8 (express train platforms, not currently used) | |||||||||||||||
| Tracks | 2+8 | |||||||||||||||
| Connections | Bus | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Elevated | |||||||||||||||
| Platform levels | 2 (S-Bahn + RE and long distance trains (ICE)) | |||||||||||||||
| Parking | No | |||||||||||||||
| Bicycle facilities | Rented boxes and bicycle stands | |||||||||||||||
| Other information | ||||||||||||||||
| Station code | ds100: ADT DB station code: 1193 Type: Bf Category: 4 | |||||||||||||||
| Fare zone | HVV: A/101 | |||||||||||||||
| History | ||||||||||||||||
| Opened | 26 September 1962 | |||||||||||||||
| Closed | Closed for reconstruction until 7 February 2025 | |||||||||||||||
| Rebuilt | 2022-2025 (S-Bahn), 2022-2027 (Long distance and regional trains) | |||||||||||||||
| Electrified | at opening, 1200 V DC system 3rd rail | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
The train station Diebsteich is served by the rapid transit trains of the Hamburg S-Bahn and the Hamburg-Altona–Kiel railway.
It is planned to replace Hamburg-Altona station for long distance and regional trains in 2027.
Right along the tracks is the border of the quarter Altona-Nord and Bahrenfeld of the Altona borough in Hamburg, Germany.
The station is named after a pond Diebsteich in the neighbourhood which no longer exists.