ElecLink
| ElecLink | |
|---|---|
| Map of ElecLink | |
| Location | |
| Country | United Kingdom, France | 
| Coordinates | 51°5′54.2″N 1°8′40.9″E / 51.098389°N 1.144694°E 50°55′12.7″N 1°46′50.2″E / 50.920194°N 1.780611°E | 
| General direction | North–South | 
| From | Folkestone, United Kingdom | 
| Passes through | English Channel | 
| To | Peuplingues, France | 
| Ownership information | |
| Owner | Getlink | 
| Construction information | |
| Manufacturer of conductor/cable | Prysmian | 
| Manufacturer of substations | Siemens | 
| Contractors | Balfour Beatty | 
| Construction started | 2017 | 
| Construction cost | £490 million | 
| Commissioned | 25 May 2022 | 
| Technical information | |
| Type | submarine cable | 
| Type of current | HVDC | 
| Total length | 51 km (32 mi) | 
| Power rating | 1,000 MW | 
| DC voltage | ±320 kV | 
| No. of poles | 2 | 
| No. of circuits | 1 | 
| Website | www | 
ElecLink is a 1,000 MW high-voltage direct current (HVDC) electrical interconnector between the United Kingdom and France, passing through the Channel Tunnel. ElecLink commenced operations on 25 May 2022.