| Line 5 |
|---|
|
|
| Native name | 重庆轨道交通5号线 |
|---|
| Status | Operational |
|---|
| Line number | 5 |
|---|
| Locale | Chongqing, China |
|---|
| Termini | |
|---|
| Stations | 31 |
|---|
|
| Type | Rapid transit |
|---|
| System | Chongqing Rail Transit |
|---|
| Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. |
|---|
|
| Opened | 28 December 2017 (2017-12-28) |
|---|
|
| Line length | 48.7 km (30.3 miles) |
|---|
| Number of tracks | 2 |
|---|
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
|---|
| Electrification | 1500 V DC overhead line |
|---|
| Operating speed | 100 km/h (62 mph) (Peak) |
|---|
|
|
|
|
= | Virtual interchange: transport | | card only, re-entry required. | |
|
|
|
Line 5 of CRT is a rapid transit line in Chongqing, China, which opened on 28 December 2017.