Garden Reach Flyover

Garden Reach Flyover
Coordinates22°31′33″N 88°18′24″E / 22.5257°N 88.3068°E / 22.5257; 88.3068
CarriesBikes, cars
LocaleKolkata, West Bengal, India  india
Characteristics
MaterialSteel, Concrete
Total length4.4 kilometres (2.7 mi)
History
Construction start2014 (2014)
Construction end2018 (2018)
Opened9 Mar 2018 (9 Mar 2018)
Statistics
TollNo
Location

The Garden Reach Flyover is a flyover connecting the Garden Reach area and Majherhat in the port area of South Kolkata. The 4.4 kilometres (2.7 mi) long and four-lane flyover was inaugurated by Chief Minister of West Bengal Mamata Banerjee on 9 March 2018. Flyover connecting Brooklyn crossing, close to Ramnagar at the Garden Reach end and terminating near Majherhat railway station. The four-lane flyover that has been set up by the Kolkata Metropolitan Development Authority (KMDA) at a cost of Rs 340 crore.