HTMS Krabi
| HTMS Krabi on Sydney Harbour in October 2013 | |
| History | |
|---|---|
| Thailand | |
| Name | HTMS Krabi | 
| Namesake | Krabi Province | 
| Builder | |
| Launched | 3 December 2011 | 
| Commissioned | 26 August 2013 | 
| Identification | 
 | 
| Status | Active | 
| General characteristics | |
| Class & type | Modified River-class patrol vessel | 
| Displacement | 2,000 t (2,000 long tons; 2,200 short tons) | 
| Length | 90.5 m (296 ft 11 in) | 
| Beam | 13.5 m (44 ft 3 in) | 
| Propulsion | 
 | 
| Speed | 25 kn (46 km/h) | 
| Range | 5,500 nmi (10,200 km) | 
| Endurance | 35 days | 
| Sensors & processing systems | 
 | 
| Armament | 
 | 
| Aircraft carried | One H145M helicopter | 
| Aviation facilities | 20 meter flight deck | 
HTMS Krabi (OPV-551) is an offshore patrol vessel (OPV) of the Royal Thai Navy. She is a modified River-class patrol vessel, and was built by Mahidol Adulyadej Naval Dockyard, with design and technology transfer support from BAE Systems Surface Ships. Additional construction took place at the Royal Thai Navy Mahidol Dockyard in Sattahip.