Havagazı (Tram İzmir)
Havagazı | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Tram İzmir light-rail station | |||||||||||
| General information | |||||||||||
| Location | Liman Cd., Umurbey Mah., 35230 Konak | ||||||||||
| Coordinates | 38°26′24″N 27°09′28″E / 38.4400°N 27.1579°E | ||||||||||
| Owned by | İzmir Metropolitan Municipality | ||||||||||
| Operated by | İzmir Metro A.Ş. | ||||||||||
| Line(s) | |||||||||||
| Platforms | 1 side platform | ||||||||||
| Tracks | 1 | ||||||||||
| Construction | |||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | 24 March 2018 | ||||||||||
| Electrified | 750V DC OHLE | ||||||||||
| Services | |||||||||||
| |||||||||||
Havagazı is a light-rail station on the Konak Tram of the Tram İzmir system in İzmir, Turkey. It is located along Liman Avenue and consists of a side platform and one track. Only Fahrettin Altay-bound (Westbound) trams stop at Havagazı, since eastbound trams travel along Şehitler Avenue one block south.
The station opened on 24 March 2018.