Hefei–Anqing–Jiujiang high-speed railway

Hefei–Anqing–Jiujiang
high-speed railway
合安九高铁
Overview
LocaleAnhui, Hubei and Jiangxi, China
Termini
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
Technical
Line length340 km (211 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed350 km/h (217 mph)
Route map

km
Hefei Beicheng
Hefei–Xinyin HSR to Xinyin South
Hefei West
0
Hefei
Shushan East
Sanshilipu
Hefei South
Zhuxi
Feidong
Feixi
to Nangang
Shucheng East
Lujiang West
Tongcheng East
Shuanggang
Huaining
Anqing West
163
Qianshan
190
Lu'an–Jingdezhen HSR
to Jingdezhen
Taihu South
220
Anqing North
Susong East
252
Anqing railway
Huangmei East
278
Anqing
Huangmei South
292
Konglong
Bianyuzhou Yangtze River railway bridge
303.3
323.7
Jiujiang Yangtze River Bridge
Jiujiang
Lushan
332
km

The Hefei–Anqing–Jiujiang high-speed railway (Chinese: 合安九高铁) is a 340-kilometre (211 mi) long high-speed rail line in China, with a maximum speed of 350 km/h (220 mph). It forms part of the Beijing–Hong Kong (Taipei) corridor. The line takes a similar route to the existing Hefei–Jiujiang railway.

The 162 kilometres (101 mi) long section from Hefei to Anqing, opened on 22 December 2020. The remaining section from Anqing to Lushan railway station in Jiujiang opened on 30 December 2021.