Zhuhai–Zhuhai Airport intercity railway
| Zhuhai–Zhuhai Airport intercity railway | |
|---|---|
CRH6A-A trains at Jingwan station | |
| Overview | |
| Native name | 珠机城际铁路 |
| Status | Operational |
| Locale | Zhuhai, Guangdong, China |
| Termini |
|
| Service | |
| Type | Regional rail |
| System | Pearl River Delta Metropolitan Region intercity railway |
| Operator(s) | China Railway Guangzhou Group |
| History | |
| Opened | 18 August 2020 (Phase 1) 3 February 2024 (Phase 2) |
| Technical | |
| Line length | 39.475 km (full line) |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Zhuhai–Zhuhai Airport intercity railway, also known as the Zhuji intercity railway, is a regional railway in Zhuhai. The Phase 1 runs from Zhuhai railway station to Zhuhai Changlong railway station, while Phase 2 terminates at Zhuhai Jinwan Airport. It is operated by China Railway Guangzhou Group. The railway is an extension of the Guangzhou–Zhuhai intercity railway.
The construction of the railway will be split into two stages: Phase 1 from Zhuhai to Zhuhai Changlong. Phase 1 started operation on 18 August 2020 (except Wanzai). Phase 2 from Zhuhai Changlong to Zhuhai Airport started operation on 3 February 2024 (except Hezhou South).