Hongyanhe Nuclear Power Plant

Hongyanhe Nuclear Power Plant
Official name红沿河核电站
CountryChina
LocationDonggangzhen, Wafangdian, Dalian, Liaoning
Coordinates39°47′45″N 121°28′50″E / 39.79583°N 121.48056°E / 39.79583; 121.48056
StatusOperational
Construction beganAugust 18, 2007 (2007-08-18)
Commission date
  • Unit 1: February 17, 2013 (2013-02-17)
  • Unit 2: November 23, 2013 (2013-11-23)
  • Unit 3: March 23, 2015 (2015-03-23)
  • Unit 4: April 1, 2016 (2016-04-01)
  • Unit 5: June 25, 2021 (2021-06-25)
  • Unit 6: May 2, 2022 (2022-05-02)
OwnerLiaoning Hongyanhe Nuclear Power Company Ltd.
OperatorLiaoning Hongyanhe Nuclear Power Company Ltd.
Nuclear power station
Reactor typePWR
Thermal capacity
  • 6 × 2,905 MWt
  • 17,430 MWt (Total)
Power generation
Units operational6 × 1,061 MWe
Make and model
Nameplate capacity6,710 MWe
(6,366 MWe net)

The Hongyanhe Nuclear Power Plant (红沿河核电站) is located in Donggang Town, Wafangdian in Liaoning Province of China. The site is within the Prefecture-level city of Dalian, 104 kilometres (65 mi) north of Dalian City proper. The first unit started commercial operations in June 2013.

Phase I consists of four CPR-1000 reactors, which is a design developed by China from the Framatome-designed PWRs at the Daya Bay Nuclear Power Plant.

Phase II is the first construction of two ACPR1000 reactors, further development of the CPR-1000. This reactor will include a core catcher and double containment as additional safety measures.