Island Rail Corridor

Island Corridor
Summit Lake on the Port Alberni Subdivision with Mount Arrowsmith in the background
Overview
HeadquartersNanaimo, British Columbia
LocaleVancouver Island, British Columbia
Dates of operation
  • Esquimalt & Nanaimo Railway 1884–1905
  • Canadian Pacific Railway 1905–2018
  • RailAmerica 2006–2018
  • Southern Railway of Vancouver Island (under contract with the Island Corridor Foundation) 2006
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Length293 km (182 mi)
Route map

Victoria Subdivision
Port Alberni
Subdivision
39.5
Port Alberni Terminal
end of track
39.0
Port Alberni
Campbell River
Planned extension - never built
171.9
38.0
Port Alberni Yard
end of track
139.9
37.2
APR Roundhouse
37.1
Port Alberni wye/Domtar Paper 2
Courtenay
139.7
37.0
Domtar Paper 1
Coastal Mountain
Fuels
139.3
Roger Creek
Millard Creek
Chinook
Forest Products
137.4
Kitsuksis Creek
Royston
135.8
35.9
Farris
Roy Creek
35.6
Solly
Trent River
33.3
McLean Mill
Washer Creek
30.4
Bainbridge
Union Bay
130.2
Mile 29.9
Hindoo Creek
Mile 28.9
Buckley Bay Road
28.1
Bostock
Buckley Bay
126.2
26.1
Tebo
Tsable River
Mile 25.0
Fanny Bay
124.7
24.6
Stokes
Mill Creek
Loon Lake West
Coal Creek
21.9
Arrowsmith
Waterloo Creek
Loon Lake East
Summit Lake
Deep Bay
121.0
21.1
Locharkaig
Rosewall Creek
Mile 20.2
Cook Creek North
Mile 18.8
Cook Creek South
18.4
Apenes
Bowser
114.5
Mile 18.1
Mountain Creek
Nile Creek
Mile 14.6
Big Qualicum River
Mile 14.0
Dunsmuir
110.2
Mile 13.8
Mile 13.7
12.7
Cameron Lake
Dashwood
105.0
Little Qualicum River
Little Qualicum River
McBey Creek
Qualicum Beach
101.8
Lockwood Creek
French Creek
French Creek
4.4
Coombs
spur
Parksville
92.5
Port Alberni
Subdivision
Englishman River
National Silicates
92.3
spur
92.1
Craig
91.9
Bryn
89.7
Hamilton Creek
Nanoose Creek
Nanoose Bay
86.7
Bonnell Creek
Jayem
84.4
Snaw-Naw-As Reserve
track removed
83.7
82.8
Green Lake
Doumont Road
spur
76.5
Wellington
77.5
Wellcox Spur
Superior Propane
75.8
Northfield
75.0
3.0
Millstone River
2.9
Wellcox Yard
Nanaimo
72.5
Chase River
Chase River
0.0
Regional Recycling
70.9
Stockett
70.0
Wellcox Spur
Starks
69.2
South Wellington
67.2
Nanaimo River
Quarry
66.1
Cassidy
64.8
Spruston Road
Haslam Creek
Storms
63.0
Brenton
61.6
Bush Creek
Harrison Creek
Ladysmith
58.4
Blaineys
56.0
Saltair
54.5
Chemainus
51.2
spur
50.7
Chemainus River
Catalyst Paper
 
Bonsall Creek
Osborn Bay
former wye junction
47.5
Westholme
46.8
Mile 46.8
Whitehouse Creek
Overflow
Mount Sicker
46.2
Tyee
44.4
Somenos
42.7
spur
42.6
Hayward
41.6
Mile 40.6
Duncan
39.7
Cowichan River
Buckerfield's
38.8
Top Shelf Feeds
38.3
Koksilah
38.1
Koksilah River
Koksilah Overflow
Koksilah Road
Cowichan
35.5
Hillbank
34.1
Cobble Hill
31.2
Northgate Road
Shawnigan Lake
tributaries
27.8
Shawnigan Lake Road
bridge out
Strathcona Lodge
26.2
Last Spike
Cliffside
25.0
Fitzgerald
21.9
Malahat
20.0
Mile 18.2
17 Mile Post
17.0
Malahat Tunnel (50m)
Arbutus Canyon
Arbutus Creek
Niagara Canyon
Niagara Creek
Niagara
13.7
Goldstream
10.7
Jacklin Centre
warehouse
8.9
Langford
7.9
Six Mile Road
Brydon Road
Island Highway/
Burnside Road
Adams Place
Palmer
4.8
Helmcken Road
Island Highway
Esquimalt
3.7
Admirals
2.5
Wholesale Club
1.4
Hereward Road
Russells
0.8
E&N Roundhouse
0.7
Harbour Road
Vic West - end of track
0.3
rail link removed during
Johnson Street Bridge
replacement in 2018
Victoria
0.0
Victoria Subdivision

The Island Corridor, previously the Esquimalt & Nanaimo Railway (E&N Railway), is a railway operation on Vancouver Island. It is owned by the Island Corridor Foundation, a registered charity. The railway line is 225 kilometres (140 mi) in length from Victoria to Courtenay, known as the Victoria Subdivision, with a branch line from Parksville to Port Alberni, known as the Port Alberni Subdivision, of 64 kilometres (40 mi), for a total 289 kilometres (180 mi) of mainline track. In 2006, the Island Corridor Foundation acquired the railway's ownership from RailAmerica and Canadian Pacific Railway.

Passenger service has been "temporarily suspended" since 2011 due to poor infrastructure condition that resulted from deferred maintenance.