Mudanjiang–Jiamusi high-speed railway

Mudanjiang–Jiamusi high-speed railway
Overview
Native name牡佳高铁
StatusOperational
Termini
Stations7
Service
Operator(s)China Railway High-speed
History
OpenedDecember 6, 2021
Technical
Line length371.6 km (231 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed250 km/h (155 mph)

The Mudanjiang–Jiamusi high-speed railway, or Mudanjiang–Jiamusi section of Shenyang–Jiamusi high-speed railway, is a high-speed railway line in China. It is 371.6 kilometres (230.9 mi) long and have a maximum speed of 250 kilometres per hour (160 mph). It was opened on December 6, 2021.