Jinan–Qingdao high-speed railway

Jinan–Qingdao
high-speed railway
Qingdao–Yinchuan corridor Jinan–Qingdao section
高铁青银通道胶济段
Overview
StatusOperational
OwnerChina Railway
LocaleShandong
Termini
Service
TypeHigh-speed rail
Operator(s)China Railway Jinan Group
History
OpenedDecember 26, 2018
Technical
Line length307.83 km (191 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)
Route map

km
Damoliu (signal station)
Dazhengzhuang (signal station)
Jinan West link to Jinan West
Huanghe South (signal station)
(connected to Shijiazhuang–Jinan HSR)
Jinan West
Damiaotun (signal station)
Baimashan (signal station),
Jinan Railway
to Dangjiazhuang
Jinan Shiji Yellow River road-rail bridge
(lower deck)
Jinan
Jinan Railway to Quanzhuang
Daminghu
Beixindian (signal station)
Beixindian link to Qingdao
0.0
Jinan East
Jinan–Laiwu HSR to Gangcheng
Jinan–Zaozhuang HSR to Taierzhuang
Jinan–Binzhou ICR to Binzhou
Wulitang (signal station)
30.6
Zhangqiu North
Qingyang tunnel
53.7
Zouping
Zibo North EMU depot line
82.3
Zibo North
112.6
Linzi North
135.4
Qingzhoushi North
190.9
Weifang North
Weifang–Suqian HSR to Suqian East
(Beijing−Shanghai HSR Second Channel)
255.4
Gaomi North
link to passenger railway via
Madian signal station to Jinan
283.4
Jiaozhou North
↑ 350 km/h
↓ 250 km/h
289.3
Qingdao Airport
Tuancun (signal station)
307.9
Hongdao
(end of Jinan-Qingsao HSR)
new Qingdao–Jinan freight line
Qingdao North
Qingdao North EMU Depot
Qingdao
km
Jinan–Qingdao high-speed railway
Simplified Chinese济青高速铁路
Traditional Chinese濟青高速鐵路
Transcriptions
Standard Mandarin
Hanyu PinyinJǐqīng Gāosù Tiělù
IPA[tɕì.tɕʰíŋ káʊ.sû tʰjè.lû]
Alternative Chinese name
Simplified Chinese胶济高速铁路
Traditional Chinese膠濟高速鐵路
Transcriptions
Standard Mandarin
Hanyu PinyinJiāojǐ Gāosù Tiělù
IPA[tɕjáʊ.tɕì káʊ.sû tʰjè.lû]

The Jinan–Qingdao high-speed railway or Jiqing high-speed railway is a high-speed railway between Qingdao and Jinan, the two main cities of Shandong province. Qingdao and Jinan were already served by two double-track lines consisting of the high-speed Qingdao–Jinan Passenger Railway and the conventional Qingdao–Jinan Railway. The new railway is a part of the Qingdao–Yinchuan corridor, one of the 8+8 national high-speed rail gridline, and provides further relief to rail transport between Qingdao and Jinan. Planning was approved by the NDRC on June 10, 2014 with construction starting a year later. Tracklaying started in 2017 and the whole line was opened on 26 December 2018. The railway shortens travel times between Qingdao and Jinan to 1 hour. This is in contrast to the 2.5 hours needed on the Qingdao–Jinan Passenger Railway and 4 hours on the original conventional Qingdao–Jinan Railway.