Kanpur Metro

Kanpur Metro
UPMRC Logo
Overview
OwnerUttar Pradesh Metro Rail Corporation
Area servedKanpur Metropolitan Area
LocaleKanpur, Uttar Pradesh, India
Transit typeRapid transit
Number of lines2
Line number
  •  Orange Line - 1  (West-South Line)
  •  Blue Line - 2  (North-South Line)
Number of stations14 (Operational)
15(Under-Construction)
HeadquartersKanpur Metro Depot, Gurudev Chauraha, Kanpur, Uttar Pradesh, 208024, India
WebsiteKanpur Metro
Operation
Began operationDecember 28, 2021 (2021-12-28)
Operator(s)UPMRC
CharacterElevated & Underground
Train length3 coaches
Headway3 minutes
Technical
System lengthOrange Line

16 km (9.9 mi) (operational)

7.78 km (4.83 mi) (Under Construction)

Blue Line

8.6 km (5.3 mi) (Under construction)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Average speed40 km/h (25 mph)
Top speed80 km/h (50 mph)

The Kanpur Metro is a mass rapid transit (MRT) system in Kanpur, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC) and it partially opened within two years of construction making it the fastest constructed mass rapid transit system in the world. The cost of construction is estimated at ₹11,076.48 crores for two lines in Phase I. Kanpur Metro will be expanded further to Kanpur Airport and other important areas of Kanpur in the future.