Kawasaki Heavy Industries & CRRC Qingdao Sifang T251

Kawasaki Heavy Industries & CRRC Qingdao Sifang T251
A T251 train arriving at Katong Park MRT station
Interior of one of the driving motor cars.
Stock typeElectric multiple unit
In service31 January 2020 (2020-01-31) – Present
Manufacturer
Built atQingdao, Shandong, China
Constructed2017 – 2022
Entered service31 January 2020 (2020-01-31)
Number built364 Vehicles (91 Sets)
Number in service252 Vehicles (63 Sets)
Formation4 per trainset
DM1–M–T–DM2
Fleet numbers2001 – 2091
Capacity1280 passengers (156 seats)
OperatorsSMRT Trains (SMRT Corporation)
Depots
Lines served TEL  Thomson–East Coast line
Specifications
Car body constructionWelded aluminium
Train length92,900 mm (304 ft 9+12 in) (with 4 Cars)
Car length
  • 23,650 mm (77 ft 7+18 in) (DM Over

Couplers)

  • 22,800 mm (74 ft 9+58 in) (M/T Over

Couplers)

Width3,200 mm (10 ft 6 in)
Height3,672 mm (12 ft 58 in)
Doors1,450 mm (57+18 in), 10 per car, 5 per side
Maximum speed
  • 100 km/h (62 mph) (design)
  • 90 km/h (56 mph) (service)
Weight
  • 39,754 kg (87,643 lb) (Fixed Seat DM)
  • 39,257 kg (86,547 lb) (Fixed Seat M)
  • 33,206 kg (73,207 lb) (Fixed Seat T)
  • 39,659 kg (87,433 lb) (Tip-up Seat DM)
  • 39,174 kg (86,364 lb) (Tip-up Seat M)
  • 33,139 kg (73,059 lb) (Tip-up Seat without ATI T)
  • 33,772 kg (74,455 lb) (Tip-up Seat with ATI T)
Traction systemMitsubishi Electric MAP-124-75V298 hybrid SiC-IGBTVVVF
Traction motors12 × Mitsubishi MB-5162-A 120 kW (160 hp) asynchronous 3-phase AC
Power output1.44 MW (1,930 hp)
AuxiliariesMitsubishi HF-IBT190A IGBT Auxiliary Power Supply Box
Electric system(s)750 V DC third rail
Current collector(s)Collector shoe
UIC classificationBo′Bo′+Bo′Bo′+2′2′+Bo′Bo′
BogiesAir-suspended, bolsterless bogie
Safety system(s)Alstom Urbalis 400 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, Iconis ATS and Smartlock CBI
Coupling systemDellner
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The Kawasaki Heavy Industries & CRRC Qingdao Sifang T251 (Contract Turnkey 251) is the first generation electric multiple unit rolling stock in operation on the Thomson–East Coast line of Singapore's Mass Rapid Transit (MRT) system, manufactured by a consortium of Kawasaki Heavy Industries (KHI) and CRRC Qingdao Sifang (formerly CSR Qingdao Sifang) under Contract T251.

91 four-car medium-capacity trainsets were purchased by LTA for the Thomson-East Coast line in 2014 and the first set was delivered on 25 May 2018.

Seven additional trains were supposed to be procured for the RTS Link as both the Singapore and Malaysian governments agreed to both lines sharing largely identical technical specifications. Since then, a new agreement signed on 30 July 2020 meant that these trains would not be built and will be replaced by LRT trains.