Lima and Callao Metro

Lima and Callao Metro
Train Alstom Metropolis 9000 in station "Villa el Salvador" (Line 1)
Overview
Native nameMetro de Lima y Callao
OwnerAuthority for Urban Transport in Lima and Callao (ATU)
LocaleLima, Peru
Transit typeRapid transit
Number of lines2
Number of stations60 (31 operational and 29 under construction)
Daily ridership692,000 per day
Annual ridership124,134,820
Operation
Began operationApril 28, 1990 (completion)
April 11, 2011 (revenue service - Line 1)
December 21, 2023 (Line 2)
Operator(s)Ferrovías (Grupo Emepa)
Number of vehicles5 × AnsaldoBreda MB-300
39 × Alstom Metropolis 9000
Technical
System length39.6 km (24.6 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC overhead catenary
Top speed80 km/h (50 mph)
System map

The Lima and Callao Metro (Spanish: Metro de Lima y Callao) is a rapid transit system that serves the cities of Lima and Callao, which make up the Lima metropolitan area. The existing metro lines (1 and 2) currently link the district of Villa El Salvador in the south of Lima with San Juan de Lurigancho in the northeast of the city, as well as a 5 km (3.1 mi) segment in the east of the metro area. Furthermore, there are four additional lines planned for the network.

Line 1 started full operations on July 28, 2014, after decades of delays. Construction of the line began during the first presidency of Alan García (1985–1990) with an initial seven stations, but the segment did not have the distance or demand required to make it commercially viable. Thus, the project stalled and became mired in accusations of bribery involving an investment of 226 million dollars co-financed by the Italian government.

During the second presidency of Alan García (2006–2011) the government resumed construction of Line 1, which opened for full revenue service in 2014. The completed line now totals 34.6 kilometers (21.5 mi) of elevated viaduct with 26 stations and crosses several districts: Villa El Salvador, Villa María del Triunfo, San Juan de Miraflores, Santiago de Surco, Surquillo, San Borja, San Luis, La Victoria, Lima District and San Juan de Lurigancho. The elevated viaduct of the Metro railway is the longest in Latin America, and was the longest in the world until it was surpassed by Wuhan Metro Line 1 in 2017.

Line 2 started operations on December 21, 2023 with the opening of its first 5 stations within Santa Anita district in the east of the city.