Line 11 (Suzhou Metro)

Line 11
A train of Suzhou Metro Line 11
Overview
StatusIn operation
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations28
Service
TypeRapid transit
SystemSuzhou Metro
Operator(s)Suzhou Rail Transit Co., Ltd
Rolling stock6-car Class B
History
Opened24 June 2023 (2023-06-24)
Technical
Line length41.27 km (25.64 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Electrificationoverhead wire
Operating speed100 km/h (maximum)

Line 11 is a rapid transit line of the Suzhou Metro system. It was formerly known as Line S1 during planning and construction. Construction started on November 27, 2018. It opened on 24 June 2023. The line uses driverless 6-car Class B rolling stock operating up to 100 km/h (62 mph). Partial through-running on Line 3 began on December 23, 2023, and full through-running began on June 29, 2024.