Line 11 (Suzhou Metro)
| Line 11 | |
|---|---|
| A train of Suzhou Metro Line 11 | |
| Overview | |
| Status | In operation | 
| Owner | Suzhou Rail Transit Co., Ltd | 
| Termini | |
| Stations | 28 | 
| Service | |
| Type | Rapid transit | 
| System | Suzhou Metro | 
| Operator(s) | Suzhou Rail Transit Co., Ltd | 
| Rolling stock | 6-car Class B | 
| History | |
| Opened | 24 June 2023 | 
| Technical | |
| Line length | 41.27 km (25.64 mi) | 
| Number of tracks | 2 | 
| Character | Underground | 
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | 
| Electrification | overhead wire | 
| Operating speed | 100 km/h (maximum) | 
Line 11 is a rapid transit line of the Suzhou Metro system. It was formerly known as Line S1 during planning and construction. Construction started on November 27, 2018. It opened on 24 June 2023. The line uses driverless 6-car Class B rolling stock operating up to 100 km/h (62 mph). Partial through-running on Line 3 began on December 23, 2023, and full through-running began on June 29, 2024.