| Line 2 |
|---|
| 2 |
|
| Locale | Lanzhou, Gansu, China |
|---|
| Termini | |
|---|
| Stations | 9 |
|---|
|
| Type | Rapid transit |
|---|
| System | Lanzhou Metro |
|---|
| Operator(s) | Lanzhou Rail Transit Co., Ltd. |
|---|
| Rolling stock | 6-car Type A |
|---|
|
| Opened | June 29, 2023 (2023-06-29) |
|---|
|
| Line length | 9.06 km (5.63 mi) |
|---|
| Number of tracks | 2 |
|---|
| Character | Underground |
|---|
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
|---|
| Operating speed | 80 km/h |
|---|
Line 2 of the Lanzhou Metro is a subway line in Lanzhou running from Yanbai Bridge to Dongfanghong Square, has 9 stations and is 9.06 kilometres (5.63 mi) long. The Phase 1 entered service on 29 June 2023. An extension is planned to Xiahewan in Anning District.