Yellow Line (Mumbai Metro)

Yellow Line
BEML rolling stock of Mumbai Metro Line 2
Overview
Status
  • Line 2A (operational)
  • Line 2B (under construction)
Owner MMRDA
LocaleMumbai Suburban district
Termini
Connecting lines
Stations17
WebsiteLine 2A
Line 2B
Service
TypeRapid transit
System Mumbai Metro
Operator(s)Maha Mumbai Metro Operation Corp. Ltd. (MMMOCL)
Depot(s)Charkop (2A)
Mandale (2B)
Rolling stockBEML
Daily ridership212,000 (July 2023)
History
CommencedNovember 2016 (2016-11)
Opened2 April 2022 (2022-04-02)
Technical
Line length18.589 km (11.551 mi)
Number of tracks2
CharacterGrade-separated, elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Yellow Line
km
0.0000
Dahisar East
Mahatma Gandhi Road
0.7110
Anand Nagar (Mumbai)
2.4227
Kandarpada
3.3831
Mandapeshwar
4.4684
Eksar
5.5375
Borivali West
6.4659
Shimpoli
7.5718
Kandivli West
8.2003
Dahanukarwadi
Charkop Depot
9.5355
Valnai–Meeth Chowky
10.8460
Malad West
12.2434
Lower Malad
13.1831
Bangur Nagar
14.4555
Goregaon West
15.4687
Oshiwara
Adarsh Nagar
16.4330
Lower Oshiwara
17.5786
Andheri West
D N Nagar
18.6376
ESIC Nagar
20.3026
Prem Nagar
20.8292
Indira Nagar (Vile Parle)
21.9025
Nanavati Hospital
23.5094
Khira NagarSantacruz
24.4660
Saraswat Nagar
25.5590
National College (Bandra)
26.6997
BandraBandra
28.9139
Income Tax Office (BKC)
Bandra Kurla Complex
Vakola Nala
30.1880
ILFS, BKC
30.8928
MTNL, BKC
32.7202
SG Barve Marg
34.3492
Kurla (East)
35.3563
Eastern Express Highway
35.9967
Chembur
36.9590
Diamond Garden
37.8190
Shivaji Chowk (Chembur)
38.9396
BSNL, Govandi
40.5467
MankhurdMankhurd
41.5074
Mandala
Mandala Depot
km

Yellow Line (Line 2) is a rapid transit metro line of the Mumbai Metro in the city of Mumbai, Maharashtra, India. The line connects Dahisar in the northwest with Mandale in Mankhurd via Andheri, BKC and Chembur in the east. Phase One of Line 2A was partially opened on 2 April 2022 from Dahisar East to Dahanukarwadi. Line 2A was completely opened on 19 January 2023 from Dahanukarwadi to Andheri West, and consisted of eight new stations

Construction on the first section of the line, called Metro 2A (between Dahisar and D.N. Road), began in November 2016, and was completed in April 2022. This section will be 18.589 km (11.551 mi) long, and comprise 17 of the 39 stations that form part of this route. The new 9.5 km (5.903 mi) section of the Yellow Line from Dahanukarwadi to DN Nagar was inaugurated on January 19, 2023, by Prime Minister Narendra Modi.