Line 3 (Changchun Rail Transit)

Line 3
A train entering Kuanping Bridge station
Overview
StatusOperational
OwnerChangchun
LocaleChangchun, Jilin, China
Termini
  • Puppet Regime Palace Museum
  • Changchun Movie Wonderland
Stations34
Service
TypeLight Rail
SystemChangchun Rail Transit
Services2
Operator(s)Changchun Rail Transit Corporation
Depot(s)Huguang Road Depot
Ski Resort Depot
Rolling stockChangchun Light Rail:3000/3500 Stock/4000 Stock
History
Opened30 October 2002 (2002-10-30)
Technical
Line length34.3 km (21.31 mi)
Number of tracks2
CharacterUnderground, at-grade and elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead line, 750 V DC
Operating speed70 km/h

Line 3 of the Changchun Rail Transit (Chinese: 长春轨道交通3号线; pinyin: Chángchūn Guǐdào Jiāotōng Sān Hào Xiàn) is a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006 and 31 December 2021. This line is currently 34.3 km (21.3 mi) long with 34 stations in operation.