Line 3 (Changchun Rail Transit)
| Line 3 | |
|---|---|
A train entering Kuanping Bridge station | |
| Overview | |
| Status | Operational |
| Owner | Changchun |
| Locale | Changchun, Jilin, China |
| Termini |
|
| Stations | 34 |
| Service | |
| Type | Light Rail |
| System | Changchun Rail Transit |
| Services | 2 |
| Operator(s) | Changchun Rail Transit Corporation |
| Depot(s) | Huguang Road Depot Ski Resort Depot |
| Rolling stock | Changchun Light Rail:3000/3500 Stock/4000 Stock |
| History | |
| Opened | 30 October 2002 |
| Technical | |
| Line length | 34.3 km (21.31 mi) |
| Number of tracks | 2 |
| Character | Underground, at-grade and elevated |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | Overhead line, 750 V DC |
| Operating speed | 70 km/h |
Line 3 of the Changchun Rail Transit (Chinese: 长春轨道交通3号线; pinyin: Chángchūn Guǐdào Jiāotōng Sān Hào Xiàn) is a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006 and 31 December 2021. This line is currently 34.3 km (21.3 mi) long with 34 stations in operation.