Line 3 (Chennai Metro)

Purple Line (Line 3)
Overview
StatusUnder construction
Termini
Connecting linesOperational (5):
Blue Line Green Line  Chennai MRTS ,  Chennai Suburban West Line ,  Chennai Suburban South Line 
Upcoming (2):
Red Line Yellow Line
Stations47
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Delhi Metro Rail Corporation (DMRC)
Technical
Line length45.4 km (28.2 mi)
Number of tracks2
Character26.3 km (16.3 mi) Underground
19.1 km (11.9 mi) Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed80 km/h (50 mph)
Route map

Madhavaram Milk Colony Red Line
Madhavaram High Road
Moolakadai
Sembiyum
Perambur Market
Perambur
Ayanavaram
Otteri
Pattalam
Perambur Barracks Road
Purasaiwakkam
Kellys
Kilpauk
Kilpauk on Green Line
Chetpet
Sterling Road
Nungambakkam
Anna Flyover
Thousand Lights on Blue Line
Thousand Lights
Royapettah
Dr. Radhakrishnan Salai
Thirumayilai Yellow Line
Mandaveli
Greenways Road
Adyar Junction
Adyar Depot
Indira-Nagar
Thiruvanmiyur
Chennai MRTS line
Tharamani
Nehru Nagar
Kandanchavadi
Perungudi
Thoraipakkam
Mettukuppam
PTC Colony
Okkiyampet
Karapakkam
Okkiyam Thoraipakkam
Sholinganallur Red Line
Sholinganallur Lake I
Sholinganallur Lake II
Semmancheri metro depot
Semmancheri I
Semmancheri II
Gandhi Nagar
Navallur
Siruseri
SIPCOT 1
SIPCOT 2

The Purple Line or Line 3 is one of the under construction lines of Chennai Metro Phase-II stretching from Madhavaram Milk Colony to Siruseri SIPCOT. The 45.4 km (28.2 mi) long line will consist of 47 stations, out of which 28 will be underground and 19 will be at grade or elevated.