Line 3 (Qingdao Metro)
| Line 3 | |
|---|---|
Line 3 platform at Qingdao Railway Station | |
| Overview | |
| Status | In operation |
| Owner | Government of Qingdao |
| Locale | Qingdao, China |
| Termini | |
| Stations | 22 |
| Service | |
| Type | Rapid transit |
| System | Qingdao Metro |
| Services | 1 |
| Operator(s) | Qingdao Metro Corporation |
| Rolling stock | Chinese Type B1 |
| History | |
| Opened | December 16, 2015 (North section); December 18, 2016 (South section) |
| Technical | |
| Line length | 24.8 km (15.41 mi) |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 of Qingdao Metro (Chinese: 青岛地铁3号线) is an underground metro line in Qingdao. The north section began operation on December 16, 2015, and the south section began operation on December 18, 2016.