Line 4 (Sistema de Tren Eléctrico Urbano)

Line 4
Train 4001 at the Line 4 yard.
Overview
Native nameLínea 4 del Tren Eléctrico Urbano de Guadalajara
Area servedGuadalajara, Tlaquepaque and Tlajomulco
LocaleJalisco, Mexico
Transit typeLight rail
Line number4
Number of stations8
Daily ridership106,000 (estimated)
Websitelinea4.jalisco.gob.mx
Operation
Operation will startEarly 2025
Operator(s)Sistema de Tren Eléctrico Urbano
Headway7 minutes (estimated)
Technical
System length21.7 km (13.5 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Average speed30 km/h (20 mph)
Top speed70 km/h (45 mph)
System map

Las Juntas
Acueducto (future infill station)
Jalisco 200 Años
Real del Valle
Maintenance facility
for broken-down trains
Concepción del Valle
El Cuervo
Lomas del Sur
CUTLAJO
Yard
Tlajomulco Centro

Line 4 is the fourth rail line of the Guadalajara Urban Electric Train System. It is 21.2 km (13.2 mi) long and will run from Las Juntas bus station of Mi Macro Calzada to the municipal capital of Tlajomulco. It is estimated that the number of daily passengers will be 106,000 passengers, and construction will cost 9.137 billion Mexican pesos (approximately 460 million U.S. Dollars). It officially began construction on May 22, 2022.