Line 5 (Ningbo Rail Transit)

Line 5
Train entering the platform of International Convention and Exhibition Center station
Overview
StatusOperational
OwnerNingbo
LocaleNingbo, Zhejiang, China
Termini
  • Buzheng
  • Luotuo Bridge
Stations24
Service
TypeRapid transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Co., Ltd.
History
Opened28 December 2021 (2021-12-28)
Technical
Line length27.9 km (17.34 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Line 5 of Ningbo Rail Transit (Chinese: 宁波轨道交通5号线) is a rapid transit line in Ningbo. It starts from west Yinzhou District and ends in Xingzhuang Road Station in Zhenhai District. In the future extension plan, the line will extend and become a loop.

The construction of the first section started on 28 September 2016. The line uses GoA4 fully automated trains. It is 27.9 km (17.3 mi) in length with 22 stations. The line opened on 28 December 2021.