Line 5 (Suzhou Metro)

Line 5
A train of Suzhou Metro Line 5
Overview
StatusOperational
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations34
Service
TypeRapid transit
SystemSuzhou Metro
Operator(s)Suzhou Rail Transit Co., Ltd
History
Opened29 June 2021 (2021-06-29)
Technical
Line length44.1 km (27.4 mi)
Track gauge1,435 mm (4 ft 8+12 in)

Line 5 is a southwest–northeast line of the Suzhou Metro system. It opened on June 29, 2021. The line is 44.1 kilometers long. Its south-western terminus is at Taihu Xiangshan station in Wuzhong District, with its north-eastern terminus at Yangchenghu South station in Suzhou Industrial Park.

50 six-car Class B fully automated subway trains were ordered for the line.