Line 6 (Wuhan Metro)

Line 6
Overview
StatusOperational
OwnerWuhan
LocaleWuhan, Hubei
Termini
Stations32
Service
TypeRapid transit
SystemWuhan Metro
Services1
Operator(s)Wuhan Metro Group Co., Ltd.
Rolling stockCRRC Zhuzhou Locomotive Chinese Type A
History
Opened28 December 2016 (2016-12-28)
Technical
Line length42.537 km (26.43 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Line 6 of the Wuhan Metro was opened on 28 December 2016. It is the fifth line of the Wuhan Metro to be opened since its creation. A 7-km extension to the line opened on 26 December 2021.

The northern end of the line is Xincheng 11th Road station in Dongxihu District. The southern end of the line is Dongfeng Motor Corporation station in Caidian District.