Line 8 (Suzhou Metro)

Line 8
A train of Suzhou Metro Line 8
Overview
StatusIn operation
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations28
Service
TypeRapid transit
SystemSuzhou Metro
Operator(s)Suzhou Rail Transit Co., Ltd
History
Opened10 September 2024 (2024-09-10)
Technical
Line length35.6 km
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h
Highest elevationUnderground

Line 8 of the Suzhou Metro (Chinese: 苏州轨道交通8号线) is a L-shaped rapid transit line on both the east-west and north-south axes. It serves Suzhou New District, Gusu District, Xiangcheng District, and Suzhou Industrial Park. Construction started on September 30, 2019, and completed in March 2024. Line 8 was opened on September 10, 2024.