Line 8 (Suzhou Metro)
| Line 8 | |
|---|---|
A train of Suzhou Metro Line 8 | |
| Overview | |
| Status | In operation |
| Owner | Suzhou Rail Transit Co., Ltd |
| Termini |
|
| Stations | 28 |
| Service | |
| Type | Rapid transit |
| System | Suzhou Metro |
| Operator(s) | Suzhou Rail Transit Co., Ltd |
| History | |
| Opened | 10 September 2024 |
| Technical | |
| Line length | 35.6 km |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Operating speed | 80 km/h |
| Highest elevation | Underground |
Line 8 of the Suzhou Metro (Chinese: 苏州轨道交通8号线) is a L-shaped rapid transit line on both the east-west and north-south axes. It serves Suzhou New District, Gusu District, Xiangcheng District, and Suzhou Industrial Park. Construction started on September 30, 2019, and completed in March 2024. Line 8 was opened on September 10, 2024.