Spirit (rover)

Spirit
The Mars Exploration Rover-2 (MER-2) during testing for mobility and maneuverability
Mission typeMars rover
OperatorNASA
COSPAR ID2003-027A
SATCAT no.27827
WebsiteMars Exploration Rover
Mission duration
  • Planned: 90 sols (~92 days)
  • Actual: 2,208 sols (2,269 days),
    landing to final contact
  • Mobile: 1,892 sols (1,944 days),
    landing to final embedding
  • Total: 2,623 sols (2,695 days),
    landing to mission end
Spacecraft properties
Dry mass185 kilograms (408 lb)
PowerSolar panels: 140 W
Start of mission
Launch dateJune 10, 2003, 17:58:47 UTC
RocketDelta II 7925-9.5
Launch siteCape Canaveral SLC-17A
ContractorBoeing
End of mission
DeclaredMay 25, 2011
Last contactMarch 22, 2010
Mars rover
Landing dateJanuary 4, 2004,
04:35 UTC SCET
MSD 46216 03:35 AMT
Landing siteGusev Crater
14°34′06″S 175°28′21″E / 14.5684°S 175.472636°E / -14.5684; 175.472636 (Spirit rover)
Distance driven7.73 km (4.8 mi)

Spirit mission patch, featuring Marvin the Martian
NASA Mars rovers

Spirit, also known as MER-A (Mars Exploration Rover – A) or MER-2, is a Mars robotic rover, active from 2004 to 2010. Spirit was operational on Mars for 2208 sols or 3.3 Martian years (2269 days; 6 years, 77 days). It was one of two rovers of NASA's Mars Exploration Rover Mission managed by the Jet Propulsion Laboratory (JPL). Spirit landed successfully within the impact crater Gusev on Mars at 04:35 Ground UTC on January 4, 2004, three weeks before its twin, Opportunity (MER-B), which landed on the other side of the planet. Its name was chosen through a NASA-sponsored student essay competition. The rover got stuck in a "sand trap" in late 2009 at an angle that hampered recharging of its batteries; its last communication with Earth was on March 22, 2010.

The rover completed its planned 90-sol mission (slightly less than 92.5 Earth days). Aided by cleaning events that resulted in more energy from its solar panels, Spirit went on to function effectively over twenty times longer than NASA planners expected. Spirit also logged 7.73 km (4.8 mi) of driving instead of the planned 600 m (0.4 mi), allowing more extensive geological analysis of Martian rocks and planetary surface features. Initial scientific results from the first phase of the mission (the 90-sol prime mission) were published in a special issue of the journal Science.

On May 1, 2009 (5 years, 3 months, 27 Earth days after landing; 21 times the planned mission duration), Spirit became stuck in soft sand. This was not the first of the mission's "embedding events" and for the following eight months NASA carefully analyzed the situation, running Earth-based theoretical and practical simulations, and finally programming the rover to make extrication drives in an attempt to free itself. These efforts continued until January 26, 2010, when NASA officials announced that the rover was likely irrecoverably obstructed by its location in soft sand, though it continued to perform scientific research from its current location.

The rover continued in a stationary science platform role until communication with Spirit stopped on March 22, 2010 (sol 2208). JPL continued to attempt to regain contact until May 24, 2011, when NASA announced that efforts to communicate with the unresponsive rover had ended, calling the mission complete. A formal farewell took place at NASA headquarters shortly thereafter.