MTR Hyundai Rotem EMU
| 
 | |
|---|---|
| MTR Hyundai Rotem EMU entering University station | |
| Interior of the Hyundai Rotem EMU | |
| In service | 2021–present | 
| Manufacturer | Hyundai Rotem | 
| Order no. | 1141B | 
| Built at | Busan, South Korea | 
| Replaced | AC Metro Cammell EMU (MLR) | 
| Constructed | 2014–2022 | 
| Entered service | 6 February 2021 | 
| Number built | 387 vehicles (43 sets) | 
| Number in service | 387 vehicles (43 sets) | 
| Formation | 9 cars per trainset | 
| Fleet numbers | D001/D003 – D127/D129 | 
| Capacity | 82,500 pphpd | 
| Operators | MTR | 
| Depots | Ho Tung Lau, Fo Tan | 
| Lines served | East Rail line | 
| Specifications | |
| Car body construction | Stainless steel + fibreglass (header) | 
| Train length | 218,952 mm (718 ft 4.2 in) | 
| Car length | 
 | 
| Width | 3.22 m (10 ft 6.8 in) | 
| Height | 4.18 m (13 ft 8.6 in) (excluding roof equipment) | 
| Platform height | 1,066.8 mm (3 ft 6.00 in) | 
| Doors | 
 | 
| Maximum speed | 
 | 
| Weight | 
 | 
| Traction system | Mitsubishi Electric MAP-194-A25V268 IGBT–C/I | 
| Traction motors | 24 × Mitsubishi Electric MB-5153-A 190 kW (255 hp) 3-phase AC induction motor | 
| Power output | 4.56 MW (6,115 hp) | 
| Acceleration | 1 m/s2 (3.3 ft/s2) | 
| Deceleration | 
 | 
| Power supply | AC-DC-AC | 
| Electric system(s) | 25 kV 50 Hz AC overhead catenary | 
| Current collector(s) | Single-arm pantograph | 
| UIC classification | Bo′Bo′+2′2′+Bo′Bo′+Bo′Bo′+2′2′+Bo′Bo′+Bo′Bo′+2′2′+Bo′Bo′ | 
| Braking system(s) | Knorr-Bremse EP2002 electropneumatic and regenerative | 
| Safety system(s) | Siemens Trainguard MT CBTC, ATO and ATP | 
| Coupling system | Tightlock | 
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | 
The Hyundai Rotem EMU (also known as R-Train or 1141B) (Chinese: 港鐵東鐵綫現代列車) is a current model of heavy rail electric multiple units used on the Mass Transit Railway in Hong Kong. The 9-car sets are manufactured by Hyundai Rotem for the North South Corridor, an extension of the East Rail line, at a cost of HK$4 billion. and the first delivery took place in 2015, while a further 6 trains were ordered in May 2020, although the 6 trains were never manufactured. Originally scheduled to enter service in late-2017 to early-2018, the trains gradually entered service from 6 February 2021. All train sets were put into service in 2022, replacing the Metro Cammell EMUs and displacing the SP1900 EMUs to the Tuen Ma Line.