Mudanjiang–Jiamusi high-speed railway
| Mudanjiang–Jiamusi high-speed railway | |
|---|---|
| Overview | |
| Native name | 牡佳高铁 |
| Status | Operational |
| Termini |
|
| Stations | 7 |
| Service | |
| Operator(s) | China Railway High-speed |
| History | |
| Opened | December 6, 2021 |
| Technical | |
| Line length | 371.6 km (231 mi) |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Operating speed | 250 km/h (155 mph) |
The Mudanjiang–Jiamusi high-speed railway, or Mudanjiang–Jiamusi section of Shenyang–Jiamusi high-speed railway, is a high-speed railway line in China. It is 371.6 kilometres (230.9 mi) long and have a maximum speed of 250 kilometres per hour (160 mph). It was opened on December 6, 2021.