Naples–Foggia railway

Naples–Foggia railway
Overview
OwnerRFI
LocaleApulia, Campania, Italy
Termini
Service
Operator(s)Trenitalia
History
Opened1867
Technical
Line length194 km (121 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification3000 V DC
Route map

km
197.540
Napoli Centrale
13 m
188.551
Casoria-Afragola
63 m
Casoria
(old)
Naples–Caivano tramway
Naples–Frattamaggiore tramway
183.819
Frattamaggiore-Grumo Nevano
52 m
182.114
Sant'Antimo-Sant'Arpino
51 m
1928 deviation
178.320
Aversa
38 m
174.660
Gricignano
20 m
to Maddaloni-Marcianise marshalling yard
168.941
Marcianise
29 m
165.720
Recale
53 m
A 1 / E45
163.400
Caserta
end of double track
61 m
155.801
Maddaloni Superiore
141 m
150.668
Valle di Maddaloni
103 m
144.228
Frasso Telesino-Dugenta
53 m
137.623
Amorosi-Melizzano
40 m
to Telese Bagni, closed 1959
132.788
Telese-Cerreto
51 m
128.648
Solopaca
57 m
120.815
San Lorenzo Maggiore
74 m
116.562
Ponte-Casalduni
111.700
108.235
Mascambroni tunnel
107.080
Vitulano-Foglianise (closed 2000)
beginning of double track
110 m
106.394
San Vitale tunnel (4164 m)
Vitulano-Foglianise
(old)
102.230
EAV line from Cancello
101.058
100.859
Benevento
122 m
94.729
Paduli sul Calore
138 m
88.920
Apice tunnel
87.758
Apice-Sant'Arcangelo-Bonito
(end of double track)
158 m
82.688
Corsano
190 m
73.902
Montecalvo-Buonalbergo-Casalbore
273 m
71.124
69.691
Cristina tunnel
(1433 m)
69.508
Castelfranco in Miscano
(opened 1939)
354 m
69.331
66.731
Starza tunnel
(2600 m)
62.654
Ariano Irpino
479 m
61.388
58.183
Ariano tunnel
(3205 m)
58.075
Pianerottolo d'Ariano
547 m
52.367
Savignano-Greci
474 m
46.076
Montaguto-Panni
395 m
42.229
Orsara di Puglia
359 m
40.129
Colle Lamia tunnel
Bovino-Deliceto
(old, closed 2016)
33.070
32.754
Bovino-Deliceto
start of double track
260 m
29.490
beginning of Ponte Albanito
deviation (opened 2016)
26.538
26.230
Troia-Castelluccio Sauri
(closed 2016)
201 m
25.487
end of Ponte Albanito
deviation (opened 2016)
24.768
24.460
beginning of Cervaro deviation
(opened 2012)
16.450
Ponte Albanito
(old)
16.125
Ponte Albanito
124 m
from Potenza
8.647
Cervaro
(closed 2012)
79 m
end of Cervaro deviation (opened 2012)
old line closed 2016
7.923
P.M. Cervaro
(crossing loop
opened 2012)
6.211
2.950
Cervaro link
double track 1941–1964
single track since 2015
from Manfredonia
0.000
Foggia
64 m
to Lucera
km
Source: Italian railway atlas

The Naples–Foggia railway is an Italian railway line connecting Naples, in Campania, with Foggia, in Apulia, crossing the Apennines at the saddle of Ariano through a series of tunnels.

The railway infrastructure is managed by the Rete Ferroviaria Italiana, which classifies it as one of its primary lines. It is part of a westward extension of Pan-European Corridor VIII.

It is being developed as a line with features of high-speed rail with the doubling of single-track sections and the raising of line speeds to between 180 km/h and 200 km/h. These improvements are intended to allow connections between Naples and Bari in two hours and between Rome and Bari in three hours in 2026.