Nissibi Bridge
Nissibi Bridge Nissibi Köprüsü | |
|---|---|
| Coordinates | 37°53′56″N 38°58′28″E / 37.899°N 38.974389°E |
| Carries | 4 (2+2) lanes of D.360 |
| Crosses | Atatürk Reservoir on the Euphrates River |
| Locale | Kahta, Adıyaman–Siverek, Şanlıurfa, Turkey |
| Characteristics | |
| Design | Cable-stayed bridge |
| Material | Orthotropic deck steel |
| Total length | 610 m (2,000 ft) |
| Width | 24.50 m (80.4 ft) |
| Longest span | 400 m (1,300 ft) |
| History | |
| Construction start | January 26, 2012 |
| Construction cost | ₺100 million |
| Opened | May 21, 2015 |
| Location | |
The Nissibi Bridge (Turkish: Nissibi Köprüsü) is a cable-stayed bridge completed on May 21, 2015, spanning the Atatürk Reservoir on the Euphrates River at the provincial border of Adıyaman–Şanlıurfa in southeastern Turkey.