North-link line
| North-Link Line | |
|---|---|
| Overview | |
| Native name | 北迴線 |
| Owner | Taiwan Railways Administration |
| Termini | |
| Stations | 13 |
| Service | |
| Type | Passenger/freight rail |
| Operator(s) | Taiwan Railways Administration |
| History | |
| Opened | 1 February 1980 |
| Technical | |
| Line length | 79.2 km (49.2 mi) |
| Number of tracks | 2 |
| Track gauge | 3 ft 6 in (1,067 mm) |
| Electrification | 25 kV/60 Hz Catenary |
| Operating speed | 150 km/h (93 mph) |
The North-Link Line (Chinese: 北迴線; pinyin: Běihuí Xiàn) is the central section of the Eastern Line of the Taiwan Railways Administration. The length of its mainline is 79.2 km (49.2 mi), and there is a 7.4 km (4.6 mi) long branch between Beipu and Hualien Port.