Purple Line (Kolkata Metro)

Purple Line
Overview
StatusPhase 1 - Operational
Phase 2 - Under Construction
OwnerIndian Railways
Line number3
Locale Kolkata Metropolitan Region, India
Termini
Connecting linesBlue Line Green Line
Stations
  • Operational: 7
  • Under construction: 5
  • Approved: 2
WebsiteIndian Railways
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
Depot(s)Joka Metro Depot
Rolling stockTwo ICF Medha rakes: MR417, MR418.
Daily ridership1200
History
Opened30 December 2022 (2022-12-30)
Last extension6 March 2024 (2024-03-06)
Technical
Line length26.88 km (16.70 mi)
  • Operational: 7.75 km (4.82 mi)
  • Under construction: 7.33 km (4.55 mi)
  • Approved: 3.3 km (2.1 mi)
  • Planned: 8.5 km (5.3 mi)
Number of tracks2
Characterelevated and underground
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification750 V DC using third rail
Operating speed80 km/h (50 mph) (designed) 55 km/h (34 mph) (commercial)
SignallingCBTC signalling system
Route map

Eden Gardens
Esplanade
Park Street
Victoria
Tolly Canal
Khidirpur
Mominpur
Majerhat
Taratala
Behala Bazar
Behala Chowrasta
Sakher Bazar
Thakurpukur
Joka
IIM-Joka
Diamond Park

Purple Line is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. A 7.75 kilometres (4.82 mi) stretch from Joka to Majerhat of this line is operational as of 2025. This line is planned to span 26.88 kilometres (16.70 mi) from IIM-Joka in the southern region of Greater Kolkata to Eden Gardens in the Central Kolkata. It has interchanges with Blue Line at Park Street and Esplanade and with Green Line at Esplanade.