Qianjiang–Changde railway

Qianjiang–Changde railway
Overview
StatusOperational
Termini
Stations10
Service
TypeHigher-speed rail, Heavy rail
Operator(s)China Railway Guangzhou Group
History
Opened26 December 2019
Technical
Line length336 km (209 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed200 km/h (124 mph)

The Qianjiang–Changde railway is an electrified higher-speed railway in China.