Rashtreeya Vidyalaya Road metro station

Rashtreeya Vidyalaya Road
Namma Metro station
The station as on December 2024
General information
Other namesR. V. Road, Rashtreeya Vidyalaya Raste, R. V. Raste, Jayanagara 5th Block, Jayanagar 5th Block
LocationRashtreeya Vidyalaya Road, 5th Block, Jayanagar, Bengaluru, Karnataka 560041
Coordinates12°55′17″N 77°34′49″E / 12.921458°N 77.580375°E / 12.921458; 77.580375
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line Yellow Line
PlatformsSide platform

Platform-1Madavara
Platform-2Silk Institute
Platform-3 → Train Terminates Here
Platform-4Delta Electronics - Bommasandra
Platform numbers (TBC)

Tracks2 + 2 (Awaiting Trainsets)
Connections Upcoming Yellow Line
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes
Architect  IVRCL Ltd.
  HCC - URC Construction JV
Other information
StatusStaffed
Station codeRVR
History
Opened  18 June 2017 (2017-06-18)
Opening  August 2025 (August 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Jayanagar
towards Madavara
Green Line Banashankari
Terminus Yellow Line
(Operational around August 2025)
Ragigudda
towards Bommasandra
Location

Rashtreeya Vidyalaya Road is an elevated interchange metro station on the north–south corridor of the Green Line and the east–west corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.

As per latest reports, the Yellow Line is slated to be operational around August 2025 instead of May 2025 which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.