Rose Fitzgerald Kennedy Bridge

Rose Fitzgerald Kennedy Bridge
Rose Fitzgerald Kennedy Bridge
Coordinates52°21′24″N 6°59′32″W / 52.3567°N 6.9923°W / 52.3567; -6.9923
CarriesN25 road
CrossesRiver Barrow
LocaleGlenmore
Official nameRose Fitzgerald Kennedy Bridge
Maintained byBAM Civil and Iridium
Characteristics
DesignExtradosed bridge
MaterialConcrete
Total length887 metres (2,910 ft)
Longest span230 metres (750 ft)
No. of spans9
Piers in water1
Clearance above36 metres (118 ft)
History
DesignerARUP and Carlos Fernandez Casado SL
Construction start2016
Construction endDecember 2019
Opened30 January 2020
Location

The Rose Fitzgerald Kennedy Bridge is an extradosed bridge over the River Barrow in Ireland. It was built as part of the N25 New Ross Bypass, and was officially opened on 29 January 2020 by Taoiseach Leo Varadkar and opened to traffic on 30 January 2020, becoming Ireland's longest bridge. The bridge received in 2021 an Outstanding Structure Award from the International Association for Bridge and Structural Engineering.